I’m weaving as fast as I can, so lots of other things aren’t getting done. Dust bunnies are building up around my house like mad Seemingly simple things like setting up glam shots for my finished pieces – one piece at a time with a nice clean background – doesn’t happen. The good news is it’s working. I’m getting lots of weaving accomplished. So without further ado, here’s more th I’ve finished so far this month – up to 11 finished pieces – Woo Hoo!
First up are 3 rayon chenille scarves; I’m calling them Paint the Town Red.
I wove these on the Missouri which is stationed at the pop up shop. From left to right is a short cowl, a long cowl, and a long scarf. The long cowl is already spoken for.
I just finished weaving a rayon chenille warp. Here it is while beaming...you can see the ladder ribbon which I’d planned to use as supplemental warp. Had only done supplemental a little bit before, and wasn’t sure if I’d like it.
I still wasn’t sure as I wove. The ladder ribbon was decidedly un-lovely. But, as it was supplemental (not essential to the cloth; could be removed after weaving without any impact on the fabric), I kept going on it.
Well. I know my newest baby is often my favorite, but I am particularly fond of these pieces. The ladder ribbon ‘jumped’ out during the wet finishing stage, and looks great, IMHO. Here’s the mobi, front and back, on Dolly, who I think wears mobis slightly better than Lady Jane.
This cowl may be spoken for. I’ll know for sure soon.
Gotta get back to the loom – 3 more pieces measured, ready to beam!
November 18th, 2018 |
No comments:
Post a Comment